Je suis très fière de la façon dont notre parc éolien apporte la preuve que la nature et la production d’électricité peuvent coexister. En Pologne, la production d’électricité a si souvent fait du tort à la nature.
Fiche récapitulative
The project will finance a 94 MW onshore wind farm located in the northern part of Poland in Pomeranian Voivodship, approximately 50 km from the coastline of the Bay of Gdansk.
The project will contribute to environmental and security of energy supply objectives. The project is located in a Cohesion priority region. It is therefore eligible under Article 309 (a) projects for developing less-developed regions and (c) common interest. The financing of this project would contribute to the EIB's lending priority policy on social cohesion, renewable energy and climate action.
Windfarms falls under Annex II of Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the Member States shall determine whether the project shall be made subject to an assessment based on defined criteria. According to national legislation, windfarms exceeding certain criteria are subject to a mandatory Environmental Impact Assessment (EIA). This was the case for the project. The environmental studies for the EIA process were undertaken and the competent authorities have granted approval containing requirements to mitigate environmental impacts accordingly. Residual impacts were classified of small magnitude and low significance.
The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures will apply. Equipment and works will be purchased through at least two contracts ?one for supply and installation of turbines, others for infrastructure works (Balance of Plant), electrical works etc.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
À la une
Au cœur du projet
Comment et pourquoi
Soutenir une transition juste et écologique
Pourquoi
- Pour lutter contre les changements climatiques, nous devons cesser de brûler du charbon pour produire de l’électricité et le remplacer par des sources renouvelables.
- Les régions à faibles revenus tributaires du charbon ont besoin de nouvelles industries afin qu’elles ne soient pas perdantes dans la transition de l’UE vers une économie neutre en carbone.
Comment
- Les parcs éoliens produisent de l’électricité sans émettre de CO2.
- Le projet soutient la création d’emplois dans le secteur des énergies vertes dans une région prioritaire au titre de l’objectif de cohésion, qui a toujours dépendu du charbon.
Secteurs et pays
REGARDER LA VIDÉO
0:55
Sur le même sujet
Le pacte vert en action
En Pologne, une modification de la législation attire les investisseurs internationaux, ce qui donne un coup de pouce aux énergies renouvelables et ouvre la voie à la transition verte
Projets et articles associés
La BEI plaide pour davantage d’investissements et de financements verts lors de la principale conférence économique de Pologne
La délégation de la Banque européenne d’investissement, conduite par la vice-présidente Teresa Czerwińska, a participé au principal Forum économique de la Pologne, qui s’est tenu du 3 au 5 septembre à Karpacz, dans le sud-ouest du pays.
Inauguration of the Herzegovina Bridge, supported by EIB Global
The inauguration of the new Herzegovina Bridge which extends nearly 1km across the Neretva River, along with the Počitelj-Zvirovići subsection of the highway, represents a significant infrastructural achievement in Bosnia and Herzegovina. As a vital component of Corridor Vc, this major transportation route aims to increase connectivity while improving travel times, traffic safety and economic relations. In line with the European Union’s Global Gateway strategy, the project has been financed with a €5 million EU grant under the Western Balkans Investment Fund, as well as a €105 million loan from the European Investment Bank (EIB Global), allocated to the entire Počitelj-Bijača section.
Solidarité à l'égard des petites îles et bon sens climatique
Les changements climatiques resteront une priorité internationale majeure pour les décennies à venir, mais les risques les plus urgents exigent une action immédiate et de nouvelles idées, selon Nadia Calviño, présidente de la BEI, et Jutta Urpilainen, commissaire européenne.
Photogallery
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes